More unique than rare features
When you buy a car to cover a lot of mileage, you pay attention to detail to ensure a comfortable journey and to save money over its lifetime; the same care is taken when buying a house to live in, so all major investments must be planned with this in mind, whether for private or public use.
Each project must be able to provide answers in terms of:
Through these answers, a well-structured design allows the selection of the best system to meet the contextual requirements of the area.
A good hybrid must also prove its effectiveness when subjected to intensive use because it is not enough to have a carpet with holes in it for it to really work.
Finally, an experienced installer and a diligent operator must be selected to ensure that the system is properly installed and maintained throughout its life cycle. POWERgrassTM maintenance is not easy to perform without training but is simple to learn if the operator is supported by an experienced technician. However, it has to be constant because correct routine maintenance prevents renovation and extraordinary costs.
Diagonal Drainage
The drainage system must remove excess rainwater and disperse much of it into the ground below to avoid burdening the sewerage system. In some cases the roots reach the drainage layer and manage to absorb the water in the underlying soil, thus saving the most precious resource.
Building an effective drainage system is very easy. The primary drainage is made after leveling and settling the ground, with two or four slopes. Then dig up to a depth of 16 inches and a width of about 16 inches around the perimeter of the area to be drained. As the water has to be dispersed along the excavation, it is sufficient to maintain the same level of excavation, thus slowing down the outflow towards the sewer. A 6 inch corrugated drainage pipe is then laid and covered with crushed stone up to the surface. Excess water can be discharged either directly into the groundwater via a sump or directly into the white water drains. POWERgrass recommends the installation of large storage tanks to contain the need for at least 5-6 irrigation cycles to save the most precious resource.
Inspection manholes placed at the points of intersection of the diagonal pipes with the perimeter pipes facilitate periodic maintenance cleaning. The channels are not necessary for drainage, as the background absorbs all the water that is dispersed or removes it through the pipes, but if the area is subject to heavy rainfall or is subject to heavy snowfall the channels collects the water that flows on the surface when the soil may be frozen.
Next, the secondary drainage must be made, then divide the field into the two axes every 10 meters or so and draw diagonally the first point on the vertical axis with the first point on the horizontal axis and so on to the end. The diagonal drains can be made with a mini-excavator or chain diggers with a section varying from 4.75 to 11.75 inches and up to 13.75 inches deep. A corrugated drainage pipe of 3.5 inches is then laid and covered with crushed stone up to the surface.
Depending on the type of ground (whether it is filtering or not), the rainfall in the area (light, slow rainfall or frequent heavy showers) and the budget available, you have to choose between a) a complete layer of fine crushed stones over the entire surface or b) micro-drains every 9.75 - 19.75 inches dug with special equipment and filled with coarse and very coarse sand.
The watering system with 24 medium-range pop-up sprinklers is designed to distribute water more evenly than long-range sprinklers and to better rationalize water consumption.
At the top of the sprinkler there must be a small soft rubber cup to hold a small sod of natural grass installed at the same height as the playing field. In fact when the system is switched off it is difficult to locate the sprinklers in the ground.
The sprinklers can be connected to a solenoid valve individually and eventually connect two valves ad the same line of the controller having in mind to a) connect sprinklers with a uniform radius of action; for example on a football pitch there are usually sprinklers with three different radii of action at 90°, 180° or 360° and b) combine sprinklers if possible from non-contiguous areas, as a good rule is to alternate irrigation zones so that the water from the previous zone/sprinkler penetrates the ground.
The programming is done with a control box and 1, 2 or 4 sprinklers are started at the same time depending on the type of system, flow rate and water pressure. When the weather is hot, it is recommended to install a pump that provides enough water and pressure to run 4 sprinklers, thus enabling the necessary water to be supplied in a short time.
A. a hybrid carpet with 2.35 inch high fibers,Cross section POWERgrass
B. a substrate complies with USGA standards based on silica sand mixed by volume at 7-10% with a mineral soil conditioner based on zeolite and a stabilized bovine compost in earthworm culture. After sewing the rolls, the hybrid turf is filled and raked with cork grains with a diameter of .02-0.1 inches and a weight of no more than 373 lbs/yd³ for approximately 0.28 inches, then filled and raked with the same mixture as before gradually until a 1.4 inches uniform layer is formed, to allow for the best interaction of the athlete's studs with the surface.
C. Greening with on-site seeding, fertilization and management of all routine maintenance activities until the field is handed over for use. The choice of species depends on the climate and the sowing season, fertilization must favor rapid grass establishment with a natural grass cover of no less than 95%. It is therefore imperative to develop a detailed plan of the activities carried out, with a list of the machinery and products available: seeds, growth promoting fertilizers, biological inoculants etc.